So, here we are, almost two weeks into the pool digging and things seem to be going pretty well. The walls are up, the concrete has been set, and they have even back-filled and graded our yard. The next step will be to pack the dirt in around the pool. The guys plan to soak the dirt with water for several days. The patio should be poured early next week and the concrete base and liner should be installed late next week. Below are pictures of the process over the last week. We, or should I say, Jen is hoping the pool is complete by Spring Break. We shall see. By the way, I'm looking for free labor to help lay sod. Any takers?